How do I migrate from SAP PI/PO to Integration Suite?
Migrate from SAP PI/PO to Integration Suite in waves. Run Migration Assessment to categorise every interface by effort, retire unused ones, convert supported patterns with SAP's migration tooling, rebuild what the tool cannot, test with realistic data, and cut over under change control. SAP PO 7.5 mainstream maintenance runs to the end of 2027.
Migration is less about moving artefacts and more about planning. Migration Assessment extracts your PI/PO configuration and places each scenario into a category, ready to migrate, adjustment required or evaluation required, with a weighted effort estimate. That report becomes your backlog.
- Assess the estate and remove inactive interfaces from scope.
- Plan waves by business domain and priority, mixing quick wins with one complex interface.
- Convert supported patterns from PO 7.5 integrated configurations: point-to-point asynchronous and synchronous, recipient list and content-based routing.
- Rebuild what tooling cannot convert, especially ccBPM or NW BPM processes and custom adapter modules.
- Test equivalence with realistic, anonymised data.
- Cut over under change control, then decommission on PI/PO after a stable run.
Extended maintenance for SAP PO 7.5 is available until the end of 2030, but starting early lets you migrate calmly rather than under pressure. Follow the step-by-step migration guide and see PI/PO vs Integration Suite.